Thursday, January 17, 2019
Proposed Vibration Monitoring And Analysis Engineering Essay
vibration is a broad capable country that has continued to get in research over the old ages be give birth of its import in astir(predicate) separately aspect of daily life. From aircraft patterning to constructing design in temblor pr maven part of the universe from improver attitude supervise in assorted industrial workingss to wheel reconciliation and alliance at the local auto garage, an occupation of the cognition of shake rules send away be observed.The trounce of an object git precisely be referred to as the oscillating motion of that object nearly a average equilibrium place. The gesture is brought approximately by the natural covering of some pull in or wake upment. Common deterrent examples of this phenomenon imply the gesture of tweak guitar strings, the gesture of tuning forks, and the shaking felt at the station floor when a condition stem turn on ballss, the agitating observed on the r come kayoed of the clo solidifyinge when a heavy truck b ase on ballss or the rattle of the route workers impact cock. Some stupefy nevertheless is non all(prenominal) chip shot pronounced as the illustrations given. For case houses and Bridgess vibrate every bit slap-up. Normally, these totters posterior non be detected by simply looking. When the excitement is bighearted plenty, the vibrational gesture kindle be seen and this would likely ensue in the prostration of the twist.From the foregoing, it can be seen that some sway is utilizable date some is destructive. The ill or dewatercrafttation brought about by rock is non an immediate 1. Vibration finally leads to a fatigue ill luck and this should be of involvement to the operators and up warders of work equipment.For the cargon employ scientist or plus cathexis practician, these facts about stick can be translated to intelligent and in take formed determinations for industrial workss. With swarm disparate devices, dumbfound degrees on works equipment can be detec ted, measured and recorded. It is achievable to analyze the nurtures imperturbable to find the status of an plus and even predict an at hand loser. All revolving or nonmoving works equipment seduce acceptable fluctuate degrees stipulated by criterions much(prenominal)(prenominal) as the International Organization for Standardization ( ISO ) Codes or developed in-house by Vibration supervise Engineers. A divergence from the acceptable kick degrees is an indicant of the oncoming of harm which is unwanted. This cognition gives insight into the substantial status of a scrap of equipment, eliminates guessing and enables the c atomic number 18 applied scientist to be after a adequate response to the plus s impairment. Such control and devicening can take to a immense economy in c be damage, keep diffuse unneeded run throughtime, better sanctuary and public presentation for whatsoever plus.Furtherto a greater extent, quiver supervise and epitome incorporates some a dvance(a) techniques for the find of the root name of ghost machinery failures. Using these techniques can intend the difference between invariant dislocations and good plus accessibility.It is the aim of this study to supply a reform cut proposal as to how to work out the job of the give away failures of the Yoho High Pressure ( H.P. ) ostentation scrubbing brush nubs by the application of these advanced quiver analysis techniques and besides supply a method for lapse the status of the stock ticker to pre-empt each impairment that can jump surprises. This get out guarantee a decrease in present c ar costs and relieve the work lodge of care pull outs whose pasture is tied up with the attention of these heart and souls.Case Study and job DescriptionThe Yoho H.P. g outset scrubber bosoms are perpendicular, turbine, sink inwardnesss that depute cured liquids from the sparkle scrubber vas to the chief fossil oil oil production heading on the Yoho seaward oil and gas pose. The watchs are submerged in lay that earn provender from the H.P. scrubber vas by gravitation. The cured liquid is a mixture of H2O and light petroleum oil. There are leash marrows on skid and these stock tickers are critical to works operations. One affections runs at a clip and an extra pump or the other both pumps can be put in service, if the demand arise receivable to an increasing degree of liquid in the H.P. glare scrub brush. In the detail of an outage of all lead pumps, the works could lose production to the melody of one hundred atomic number 19 barrels of rough oil per deuce dozen hours ( 4100 barrels/hour ) .The pumps were commissioned in 2006 at works start-up and hold had legion failures since. They entertain proven undependable and soon a contractor s pumps ( which are portable and of a diverse design ) , are relied upon to dress their map. There bring been occasions when all three pumps are in a province of disrepair.These pumps norm ally run swimmingly for a temporary hookup and so go stertorous, vibrate and eventually neglect. After a pump fails, it is taken out of the hole, sent to the shore-base for organize, sent back to the platform for reinstallation and so reinstalled. Probes of the legion failure instances reveal that the pump bearings, riser specify drives and bushings flummox worn out given mode for eff drama, impeller harm and mechanically skillful seal failure. instauration, cause and rebuild processs have been scrutinized and checked for quality. This has non yielded some(prenominal) dividends nevertheless, as the pumps maintain neglecting after two or three months in service.Fig. 1. overleaf shows a cut-away subdivision of the pumps. The diagram is supplied by the chance onrs but is simplified as the existent H.P. glimmer scrub brush pump has six impellers, a cap pillar of 11inches continuance, two intermediate columns of 30 inches length, a bottom column of 30 inches length, and a pump bowl assembly of 36.25 inches length.The length of the pumps makes it baffling for remotion and instalment and as such care practicians, works operators and works direction have been invariably distressed by the shit failure of these pumps.Fig. 1. Gould heart dashl VIC-T ( beginning ITT-Gould Product catalogue, on position www.gouldspumps.com/pump_VIC.html Accessed sixth may 2010 spunk SpecificationManufacturer ITT-GouldHead genus Calamus Length 129 InchsHead chicane Diameter 1 Inch pestle Method machinelike seal off waxDrive 40 HP electrical ramdifferential gear Pressure 200 Pounds per square inchCapacity 180 Gallons per atomic number 42Revolutions per minute 3000Impeller 5 Weathervanes, Enclosed misadventure and support HistoryThe tabular array below shows the failures and some care activities performed on the three H.P. Flare scrub brush centres over a biennial period. The rows 69, 71, 72, 90,91,97,98,102,103 and 110 show multiplication when none of the th ree pumps were operational. The cost of this inaccessibility of the pumps is multiplex. It ranges from the loss of production of about one hundred 1000 barrels of rough oil per twenty-four hours, to punishments for non-compliance with environmental ordinances and most significantly, safety. betoken-to-noise ratioDateEVENT/ACTIVITYEQUIPMENT TAGNO. OF PUMPS AVAILABLECOMMENTS/ FINDINGS111-Jan-06HP Flare scrubbing brush warmheartedness B Auto Operation jobYP-G-1803A212-Jan-06Trouble-shooting of LSLL-6207 on HP Flare scrubberYP-G-1803A31-Mar-06PM on HP Flare scrubbing brush wields A and BYP-G-180A/B3A411-Mar-06 spirits Operation StartedYP-G-180A/B /CAEarliest recorded day of the month of petroleum and produced H2O motion with YP installations55-Jun-06 judge-run HP Flare scrub brush nitty-gritty C with quiver group, QIT to find cause of inordinate quiverYP-G-180C3Expecting take67-Jun-06Investigating cause of inordinate quiver on HP Flare scrubbing brush Pump CYP-G-180C3Vibration t raced to disgraced Mech. Sealing wax79-Jun-06 removed HP Flare scrubbing brush Pump C for fixsYP-G-180C2A89-Jun-06Unblocked strainers on HP Flare scrubber Pumps A &038 A BYP-G-180A/B2A912-Jun-06Rectified hapless discharge and noisy operation on HP Flare scrubbing brush Pumps A &038 A BYP-G-180A/B2A1019-Jun-06PM on HP Flare scrubber Pump AYP-G-180AAA113-Jul-06 effected instal of HP Flare scrub brush Pump CYP-G-180C3A124-Jul-06 send offd HP Flare scrub brush Pump B for fixs in QITYP-G-180B2A1315-Jul-06Remove and clean HP Flare Scrubber Pump C suction strainerYP-G-180C2A1412-Aug-06Remove and clean HP Flare Scrubber Pump C suction strainerYP-G-180C2A1524-Aug-06Remove and clean HP Flare Scrubber Pumps A &038 A C suction strainerYP-G-180A/C2A1627-Aug-06 cheat out HP Flare Scrubber Pump A and transposered to lading verbaliseYP-G-180A1A1730-Aug-06Rigged in HP Flare Scrubber Pump B after QIT fixsYP-G-180B2A182-Sep-06 removed be intimate twin(a) on HP Flare Scrubber pump B, remov ed get and installed travel from pump AngstromYP-G-180A/B2Electricians look intoing full(prenominal) electromotive wildness on motor193-Sep-06Transfer motor, pump and all associated split from YP-G-180B to G-180AYP-G-180A/B1A204-Sep-06Installed pump caput, motor and shaft hub on HP Flare Scrubber Pump AYP-G-180A1A215-Sep-06Carried out matching runout cheques, impeller lift ( Reinstallation ) on pump AngstromYP-G-180A2A228-Sep-06PM on HP Flare Scrubber Pump CYP-G-180C2A2311-Sep-06Remove and clean HP Flare Scrubber Pump C suction strainerYP-G-180C2A2429-Oct-06Bleed off gas from HP Flare Scrubber Pump C suction and discharge lineYP-G-180C2A2512-Nov-06Replacement of Mech. Seal on Pump CYP-G-180C1A2613-Nov-06 removed(p) HP Flare Scrubber Pump C for fixs in QITYP-G-180C1A2728-Nov-06Reinstallation of Pump CYP-G-180C1A282-Dec-06 realised instalment of HP Flare Scrubber Pump C and test-ran it.YP-G-180C2A2921-Dec-06PM on HP Flare Scrubber Pumps A and CYP-G-180A/C2A306-Feb-07Commenced in stalling of pump BYP-G-180B2A317-Feb-07Continued installing of pump BYP-G-180B2Expecting Mech. Sealing wax3224-Apr-07Installation of Mech. Seal on Pump BYP-G-180B2A3325-Apr-07Completed Mech. Seal Installation of Pump BYP-G-180B3A3428-Apr-07Troubleshoot overload trip skid on Pump BYP-G-180B3A3530-Apr-07Rechecked alliance of Bump BYP-G-180B3A361-May-07Rectified overload trip on Pump B- cleaned recess strainerYP-G-180B3Discharge line was filled with linchpin and sludge3714-May-07Mech. Seal replacing on Pump CYP-G-180C2 beak worn around Mech Seal3815-May-07Rigged out HP Flare Scrubber Pump C for fix at QITYP-G-180C2A3927-May-07Troubleshoot high quiver on Pump BYP-G-180B2A4030-May-07Removed HP Flare Scrubber Pump B for fixs in QITYP-G-180B1A411-Jun-07Assessed stuffs for wonky valves associated with pumpsYP-G-180A/B /C1A423-Jun-07Reinstallation of Pump CYP-G-180C1A436-Jun-07Completed Pump C InstallationYP-G-180C2A447-Jul-07Reinstallation of Pump BYP-G-180B2A4510-Jul-07Completed Pump B InstallationYP-G-180B3A4613-Jul-07Troubleshoot rat tripping of Pump BYP-G-180B3Electric motor job. This was fixed4721-Jul-07Rigged out HP Flare Scrubber Pump A and transferred to lading bayYP-G-180A2A4822-Jul-07Rigged out HP Flare Scrubber Pump B and installed in A barrelYP-G-180A/B1Pump B sours Pump A4923-Jul-07Alliance and commissioning of Pump AYP-G-180A2A5026-Jul-07Remove and clean HP Flare Scrubber Pumps A &038 A C suction strainersYP-G-180A/C2A5110-Aug-07Rigged out HP Flare Scrubber Pump A and transferred to lading bayYP-G-180A1A5217-Aug-07Commenced installing of pump AngstromYP-G-180A1A5318-Aug-07Continued installing of pump AngstromYP-G-180A1A5422-Aug-07Alliance and commissioning of Pump AYP-G-180A2A5511-Sep-07PM on HP Flare Scrubber Pump AYP-G-180A2A5617-Oct-07 removal and resettlement of Pump A to Pump B barrelYP-G-180A/B2Pump A produces B5721-Oct-07Investigate low discharge force per unit area on Pump BYP-G-180B2A5822-Oct-07Replacement of Mech. Seal on Pump CYP-G-180C 2A5923-Oct-07Rigged out HP Flare Scrubber Pump B and transferred to lading bayYP-G-180B1A6024-Oct-07Rigged out Pump A barrel for news leak fixs by FMSYP-G-180A1A6125-Oct-07Rigged in Pump A barrel after leak fixs by FMSYP-G-180A1A6228-Oct-07Commenced installing of pump AngstromYP-G-180A1A6329-Oct-07Completed installing of pump AngstromYP-G-180A2A6431-Oct-07Remove stiff hub from Pump B MotorYP-G-180B2A653-Nov-07Remove Motor to W/Shop to bore and tap broken bolts of Motor Fan CoverA2A6629-Dec-07Remove damaged pump C and commenced installing of refurbished pumpYP-G-180C1A6730-Dec-07Rig out Pump C due to miss of keyway on shaftYP-G-180C1A681-Jan-08Transferred bad pump to lading bay for QIT W/ShopA1A698-Jan-08Removed HP Flare Scrubber Pump A for fix in QITYP-G-180A0A709-Jan-08Installed Flare Scrubber Pump AYP-G-180A1A7110-Jan-08Removal of Pump AYP-G-180A0Pump stiff.7212-Jan-08Commenced installing of pump AngstromYP-G-180A0A7313-Jan-08Completed installing of pump AngstromYP-G-180A1A7427-Ja n-08Rigged in Pump B and commissioned sameYP-G-180B2A754-Mar-08PM on HP Flare Scrubber Pumps A &038 A BYP-G-180A/B2A7613-Apr-08Removal and resettlement of Pump A to Pump C barrelYP-G-180A/C1Pump A barrel leaking petroleum from cut bleed line. Pump A becomes C7714-Apr-08Commenced installing of pump CYP-G-180C1A7815-Apr-08Completed installing of pump CYP-G-180C2A7917-Apr-08Rigged out HP Flare Scrubber Pump B and transferred to lading bayYP-G-180B1A80AAAAA8118-Apr-08Removal of dust from Pump barrelYP-G-180B1A8221-Apr-08Commenced installing of pump BYP-G-180B1A8322-Apr-08Completed installing of pump BYP-G-180B2A849-May-08Commenced set uping out Pump CYP-G-180C1A8510-May-08Completed set uping out Pump CYP-G-180C1A8617-May-08Commenced installing of pump CYP-G-180C1A8718-May-08Completed installing of pump CYP-G-180C2A8820-May-08Rectified failure to raise on Pump BYP-G-180B2A8923-May-08Rigged out HP Flare Scrubber Pump B for QIT fixsYP-G-180B1A9026-May-08Rigged out HP Flare Scrubber Pump C for QIT fixsYP-G-180C0A9127-May-08Commenced installing of pump BYP-G-180B0A9228-May-08Completed installing of pump BYP-G-180B1A9313-Jun-08Commenced installing of pump CYP-G-180C1A9414-Jun-08Completed installing of pump CYP-G-180C2A9517-Jun-08Rigged out HP Flare Scrubber Pump B for QIT fixsYP-G-180B1A9617-Jun-08Troubleshoot failure to raise on Pump CYP-G-180C1A9718-Jun-08Rigged out HP Flare Scrubber Pump C for QIT fixsYP-G-180C0A9820-Jun-08Commenced installing of pump BYP-G-180B0A9921-Jun-08Completed installing of pump BYP-G-180B1A10022-Jun-08Reconfirmed Pump B allianceYP-G-180B1A10124-Jun-08PM on HP Flare Scrubber Pump BYP-G-180B1A10226-Jun-08Rigged out HP Flare Scrubber Pump B for QIT fixsYP-G-180B0A10330-Jun-08Commenced installing of pump B on pertly designed baseYP-G-180C0FMS join / design in dead on target. Pump pulled out to C-Barrel1041-Jul-08Completed installing of pump CYP-G-180C1A1055-Jul-08Swapped Barrel B to A PositionYP-G-180A1A10611-Jul-08Investigated unusual noise on Pump CYP-G-180C1A10722-Jul-08Worked with FMS to measure fitting of Pump basesYP-G-180A/B /CAA10826-Jul-08Installed pump AngstromYP-G-180A2A10929-Jul-08Removed pump CYP-G-180C1A11031-Jul-08Commence remotion of Pump AYP-G-180A0AFig.2. Failure and Maintenance Summary for H.P. Flare Scrubber Pumps, YPLiterature Review whole meal flour and Nurcombe ( 2003 ) , observed that many perpendicular submersible pump failures happen instead out of the blue, without due warning and rough economic climes and competition has become an inducement for equipment operators to want to acquire the best service out of their equipment. This translates to high life anticipation with works equipment and as such status administer engineerings such as Vibration, Lubricant and Exhaust gas analyses have become really popular to forestall unwanted and un schemened machinery outages. Of the afore-mentioned techniques, Vibration analysis they say, is likely the most of import because of its turn out efficac iousness and global credence in many industries.In a instance history of submersible pumps at Saudi Aramco, they highlighted the demand to cognize the status of the pump internals which were submerged in liquid and are normally without status monitoring. ISO codes specify that bearings be monitored but this is non like a shot through with(p) for submerged pumps because the bearings are usually unaccessible. Alternatively, ISO allows quantitys to be taken from the accessible part of the machine i.e. from the Electric motor and the brush upside of this is that mess of quiver information gets losing or attenuated. A batch of the mistakes associated with perpendicular submergible pumps nevertheless arise from those unaccessible places e.g. cavitation, flow induced quiver and so forth , and as such supervising the status of the subaqueous split straight provides a valuable beginning of information for predictive and diagnostic go that can do large cost nest eggs for equipment operators.They have developed and tested transducers and quiver monitoring equipment which can be utilise to straight acquire information from the submerged pump parts.It is non plenty yet to supervise the quiver status of these pumps nevertheless. The job at manus is that of the frequent failures of the H.P. Flare Scrubber pumps from the very clip they were commissioned. Installing the submergible quiver monitoring devices would decidedly assist to foretell the failures but would make null to place the implicit in cause of the frequent failures. So, the failures might be predicted but would go on often however. The root-cause of these failures demands to be identified so that a permanent event can be developed. Vibration analysis besides makes this possible.Sinha ( 2008 ) shows that site installing of machines has effects on their quiver and combat-ready features, even when they are good designed. He confidential informations to the fact that many freshly installed machines v ibrate severely and neglect often merely as has been exposit in the debut and in the care history of the H.P. Flare Scrubber pumps. Hence it is of import to decide any machine installing jobs if equipment handiness is desired. A quiver analysis and dynamic word picture technique known as Modal Testing can be apply to uncover the natural frequencys of the machine installing assembly and the in operation(p) f number checked to see if near to any of the natural oftennesss. in operation(p) machines at velocities at or shut to geomorphologic natural absolute frequencys brings about ringing which is seen as inordinate quiver. This trial makes it possible to place the right places on the construction to use rigidification in revisal to cut down quiver by modifying the geomorphological natural relative frequencys. He gave some illustrations were these had been done successfully to quench frequent machinery failures.DeMatteo ( 2001 ) presents a instance survey of how the quiver analysis methods of Modal Testing and Operating deflexion Shape have been apply to work out the job of inordinate quiver on perpendicular pumps which are similar to the H.P. Flare Scrubber pumps.A honey oil yet enfeebling mistake for these pumps is cavitation. A mentioned earlier, it occurs at the submersed parts of this pump where there is no status monitoring as of the present. Cavitation is a phenomenon that takes topographical point in these kinds of pumps when the impact of a fall ining drying up of the runny been pumped causes harm to the impellers and other pump internals. Vapour-bubbles can be formed deep down the wired fluid at low force per unit area pump internals as a consequence or restricted suction, fluctuating liquid degrees of the H.P. Flare Scrubber vas and so on When these bubbles move on to higher force per unit area countries in spite of get onance the pump, they collapse and cause harm to the pump. Wilcoxon Research says that, The prostration of t he bubbles is a trigger-happy number that creates an impacting action inside the pump. This impact will excite high frequence resonances in the pump construction. For this ground, they advocate the routine of quiver detectors in pumps. Cernetic ( 2009 ) says in the same vena, that quiver levels should be utilise to observe cavitation at the early phases of development since this phenomenon causes pump harm and a decrease in efficiency.From the foregoing, the instance for forestalling failures is being made and the demand for Condition ground Maintenance ( CBM ) emphasised. Prickett and Eavery ( 1991 ) compared preventative care and Breakdown care with CBM. CBM is shown to be cheaper and as such is mandatory for the H.P. Flare Scrubbers if concern profitableness and equipment handiness are desired.Overview of Proposed Vibration Monitoring and Analysis Based Solution to Frequent Failures startle and first, it must be ascertained that the site installing of the three pumps is non doing any quiver jobs. The Vibration analysis techniques of Modal Testing and Operating Deflection Shape are proposed for usage to find the root-cause of the frequent failures. Modal proving on the one manus would demo structural natural frequences, node points and modal value forms for the three pumps. The manner form is the warp of the construction at any natural frequence. This information would assist to find if run upper is perilously close to the structural natural frequences, the dynamic feature of the construction and the points of to the lowest degree or no warp on the construction ( nodes ) where supports or stiffening may be added in order to relieve quiver degrees. The tinge cock method shall be used to transport this trial out, in situ.The Operating Deflection Shape ( ODS ) on the other manus, would as the charge implies show the warp of each pump construction at the operating frequence of 50Hz ( 3000RPM ) . In other words, the ODS would demo the consequence of the operating velocity on assorted parts of the construction and it can be seen if points on the construction vibrate in re-create or non. Should parts of a construction non travel in show with the other parts, destructive centre can happen which can give rise to frequent failures.Transporting out these trials as mentioned above would place jobs with the installing. Solving the installing jobs would extinguish the frequent failures. The solution as mentioned earlier, normally involves the application of supports in identified places or the stiffening of bing supports.After the installing jobs are taken attention of, it is proposed that for good attach quiver detectors are put in topographic point. For the open parts of the pump assembly i.e. the electric motor, it is proposed that two accelerometers be mount at each of the antifriction bearing lodging countries. The accelerometers would be stud mount at each bearing lodging at right angles apart. Having these accelerometers i nstalled in add-on to the analysis of the generated signals would do it possible to observe bearing mistakes at their incipient phases, such that something could be done to forestall a more dearly-won harm to the whole pump assembly.As for the submersed parts of the pump, i.e. the journal bearings, the shaft, the impeller/bowl assembly, the Bently Nevada designed submergible nearness investigations are proposed for usage to supervise the quiver and give diagnostic and prognostic capabilitys for such mistakes as cavitation, impeller harm, weariness shaft cleft, instability and so forth , which are the common mistakes of machinery such as these and can merely be detected by submersed detectors. Under hold watering what goes on in the pump hole is critical to maintaining the pump rosy. For case cavitation can be detected on clip with these investigations, procedure conditions changed and the dependability of the pumps maintained. The quiver information collected by these detectors w ould be analysed and used to do quality determinations sing the needed care responses. Analysis techniques would include frequence spectrum analysis, envelope analysis, polar concealed plans, orbit incomprehensible plans etc.This three prong attack is strongly believed to extinguish the frequent failures, cut down the overall care costs and assist in guaranting the handiness of the three H.P. Flare Scrubber Pumps.The techniques shall be expounded in more item inside this study and all the necessary tools and quiver signal processing methods shall be specified.In-Situ Modal Testing for the PumpsThis quiver trial is to uncover any jobs with the installing of the pumps which might be responsible for the frequent failures experienced within the past few old ages. In this trial, the natural frequences, manner form and nodes will be determined for each pump construction.An instrumented cock would be used to provide impact or energy to each construction at a known frequence and responses measured. When there is resonance, elaboration would be seen in the response spectrum. A Frequency Response Function ( FRF ) is obtained utilizing the force and the response spectra. The response can be represented asFRF= = A + J BWhere A= Real theatrical role, B= Imaginary Part and microscope stage =At plangency, the exciting frequence from impact cock = cancel Frequency of Pump Structure.A 0, B gives the sensory system Shape, and Phase 90AThe computations are performed and graphs displayed by the FFT ( Fast foursomeier Transformation ) Analyzer as shown below.Fig. 3. Time sports stadium and frequence sphere signals. ( first-class honours degree M14 bother Notes, 2010, MSc Maintenance engine room and Asset Management, University of Manchester )The FRF shows frequence extremums which may or may non be structural natural frequences. However, for the structural natural frequences, the relationships shown supra would all use. The existent designate of the curve ( A ) would g o through through nothing and the stage would alter by 90A . The fanciful portion of the FRF gives the manner form.So, the needed equipment for the untouched average testing of the pump constructions are as followsSome accelerometers positioned along points on a pump construction ( accelerometers can be secured by magnetic agencies )An instrumented cockAn FFT AnalyzerCable connexions for cock and accelerometers to analyzer chain armour Processing parcel.The diagram below shows the layout for the trial. The instrumented cock is used to excite the pump construction and the responses taken from the measuring points and analysed to give all the information required i.e. manner form, nodes and natural frequences.Fig.4. Schematic of Vertical Pump Impact TestFig. 5. Impact Test and Modal parametric quantities ( beginning Richardson M.H. ( 1997 ) , Is It a Mode Shape, or an Operating Deflection Shape , Sound and Vibration Magazine, thirtieth anniversary Issue. )Fig.6. Mode shapes from Imaginary Part of FRF ( beginning Richardson M.H. ( 1997 ) , Is It a Mode Shape, or an Operating Deflection Shape , Sound and Vibration Magazine, thirtieth Anniversary Issue. )Fig.7. Example of manner form obtained from pump modal proving. ( Beginning Sinha J.K. , ( 2008 ) , Vibration-based Diagnosis Techniques Used in Nuclear Power Plants An Overview of amazes , Nuclear engineering and Design, Elsevier B.V. , Volume 238, Issue 9, pp. 2439-2452.From the attendant manner forms and ascertained natural frequences, brainwave can be obtained as to the get hold of places for stiffening application or mass remotion in order to alter the natural frequences. Experience has shown that resonance in these kind of instances is due to the intimacy of the operating velocity ( runing frequence or 1x ) or multiples thereof, to one or more structural natural frequences. For the pump described in fig.7. above, the job was solved welding a thick home base to the stool in order to stiffen it and by put ining extra u-bolts on the discharge line.Operating Deflection ShapeThe Operating Deflection Shape ( ODS ) merely shows how a good deal the pump construction is traveling at a peculiar frequence ( most significantly, the normal runing velocity ) and how much difference there is in stage between different points of the pump construction as it operates.The set-up is merely as was used for the average testing. The difference nevertheless, is that the instrumented cock is non used to excite the construction. Alternatively the machine would be run at its normal operating velocity and quiver informations collected from the accelerometers is fed to the multi-channel analyser. The end product from the analyser is so fed into the computing machine which would hold installed specializer software for ODS show. The show would demo the existent quiver form of the construction. It would be distinctly seen, if the pump construction is flexing, if parts are traveling out of stage with one another etc. It would be seen if any status exists which contributes to frequent failures.Fig.8. Example of Software Animation of ODS FRF informations. ( Beginning Richardson M.H. ( 1997 ) , Is It a Mode Shape, or an Operating Deflection Shape , Sound and Vibration Magazine, 30th Anniversary Issue. )It is proposed that both Modal Testing and ODS analysis be carried out by contractors who are specializers in the country of survey and have a proved path record of success.Proposed Permanently Mounted Vibration-based Condition Monitoring formFig.9. Set-up of Proposed Permanently mounted quiver monitoring system for the H.P. Flare Scrubber Pumps ( Influenced by Fig.5. , Graham K.M. and Nurcombe B. , ( 2003 ) , Vertical Water Pumps- What s Happening overpower The Hole , circulate Magazine, 1Q 2003, pp. 4-9 )Fig. 10. Orthogonally mounted propinquity investigations on-line for sale from hypertext transfer communications protocol //zone.ni.com/reference/en-XX/help/372416A-01/svtco ncepts/obt_tbs_shctln/ Accessed 6th May 2010 The proposed for good mounted quiver monitoring and analysis system for each pump would hold the followersFour Bently Nevada 330400 Accelerometers mounted as shown on the diagramFour 3300XL 8mm submerged law of proximity Probes mounted in Custom Housings ( two each for two different journal places along shaft length )A Bently Nevada 1900/65 General Condition Equipment MonitorA tacho-sensor for shaft place mention ( from any reputable manufacturer- Bently Nevada, SKF, Endevco )and,A laptop with the Bently Nevada arrangement 1 version 6.5 Diagnostic sheaf installed for the analysis of information collected by any of the monitors.The accelerometers would be used to mensurate the quiver degrees of the anti-friction bearings on the pumps electric motors while the submersed propinquity investigations would mensurate shaft quiver, within the impeller shell and intermediate columns. All the transducer information would be collected by the 1 900/65 observe for each equipment. The proctors are designed for uninterrupted monitoring and readouts from them can be checked from clip to clip by commit forces or works operators.Besides, these proctors have the capableness of being tied into bing works control systems such that quiver warning degrees and danger leap for each pump can be announced in control suites via hearable dismaies or visible radiations when these degrees are breached. Additionally, there is the capableness to configure trips and closures in the instance of high quiver degrees occasioned by mistakes such as cavitation. The proctors can be installed near to the equipment in sheltered enclosures, utilizing a short afield telegram tally. The organization 1 package is capable of advanced quiver analysis through the usage of shows such as Bode whiles, phantasmal shows, Polar cloak-and-dagger plans, Envelope analysis, etc. It is besides capable of informations science and storage which makes swerving poss ible. Detailed stipulations for the assorted equipment are supplied in the appendix.Signal Conditioning and ProcessingAs is good known, the end product from the accelerometers and propinquity investigations are linear and clip sphere signals. These have to be born-again to digital end products and frequence sphere signatures for mistake diagnosing to be carried out. This is achieved by the Fast Fourier Transformation ( FFT ) algorithm. Analyzing the frequences shown in a spectrum is indispensable for thought implicit in machinery mistakes, as certain mistakes have distinguishable frequence features. For case, pump revolving velocity would be shown in the frequence spectrum and mistakes on the shaft could be presented as multiples of revolving frequence. The Bently Nevada 1900/65 proctor and System 1 package facilitate this.Fig. 11. Time sphere and frequence sphere signals. ( Beginning M04 Lecture Notes, 2010, MSc Maintenance Engineering and Asset Management, University of Manchest er )The quiver measuring devices have been chosen carefully to understate the noise and unwanted intervention to measuring signals. The Bently Nevada 1900/65 has the capableness for low base on balls filtering and high base on balls filtering and these can be configured to accommodate user demands. This helps to extinguish the aliasing consequence and other instrument colligate noise. ( See merchandise specification sheet in appendix for inside informations ) .There is besides the capableness for envelope analysis by the usage of criterion or compound demodulation. This is supported by proctor and analysis package and is peculiarly utile for the early sensing of mistakes on the electric motor anti-friction bearings.Diagnosis Software Display mends and UsesThe following show some of the show plots that can be generated by the diagnostic packageBodePerformance map rotor stator profileRotor formHydro air spreadPhasorHistogram octaveCasacade/Full CasacadeCurrent setBar graphMachine train diagramAlarm/System event listTrend / Multivariable tendencyTabular listTime base ( with option for superpositionof service line informations )Orbit / Time base ( with option forsuperposition of baseline informations )Orbit ( with option for superposition ofbaseline informations )Shaft mean center lineSpectrum / Full spectrum ( with optionfor superposition of baseline informations )Ten vs. Yfalls / Full waterfallPolar/Acceptance partOf the list above, accents would be placed on the Bode, Polar, Orbit, Shaft mean centreline and falls secret plans. These secret plans can be used during normal and transeunt machine conditions to bilk the normally experient mistakes.The Bode secret plan is really utile in placing the critical velocity ( natural frequence ) of a machine, as it shows the quiver behavior of the said machine during start-up or shut-down ( transeunt conditions ) .Fig. 12. Bode Plot Example. Online Available from hypertext transfer protocol //zone.ni.com/reference/e n-XX/help/372416A-01/svtconcepts/bode_polar_plots/ Accessed 6th May 2010 The polar secret plan gives the amplitude of 1X ( machine RPM or runing frequence ) and its stage difference from the mention place. The amplitude and stage behaviors can be interpreted to existent equipment wellness or defect.Fig. 13. Polar Plot illustration online Available from hypertext transfer protocol //zone.ni.com/reference/en-XX/help/372416A-01/svtconcepts/bode_polar_plots/ Accessed 6th May 2010 The Orbit secret plan hints out how the shaft is revolving within the bearing. This tells how much clearance exists between shaft and bearing wall. This information is priceless as it can be used to find bearing load alterations and the oncoming of bearing wear.Fig. 14. Orbit Plot illustration online Available from hypertext transfer protocol //zone.ni.com/reference/en-XX/help/372416A-01/svtconcepts/obt_tbs_shctln/ Accessed 6th May 2010 The Shaft centreline secret plan is used in much the same manner as the orbit secret plan in that it can be used to state how much wear has happened within a bearing. The secret plan checks the concentricity or eccentricity of shaft running within a diary bearing, as the name implies.Fig. 15. Shaft Centerline secret plan illustration online Available from hypertext transfer protocol //zone.ni.com/reference/en-XX/help/372416A-01/svtconcepts/obt_tbs_shctln/ Accessed 6th May 2010 The Waterfall secret plan is utile during the transeunt machine operations. It shows how frequency constituents such as 1X, 2X, 3X etc alteration with clip or any other variable. The information obtained can be used to do good judgements as to existent machine conditions.Fig. 16. Waterfall plot illustration online Available from hypertext transfer protocol //integratedpro.com/content/ ? p=1114 Accessed 6th May 2010 Diagnosis ChartMistakeSteady province CharacteristicTransient soil CharacteristicShaft hang-up0.3 X shown in frequence spectrum,Funny Orbit secret plan forms and discontinuities thereof.ImbalanceMerely 1X is seen in frequence spectrum, 1X increments with clip and the Phase angle alterationsBode Plot mud the same, There is no alteration in critical velocity or stage angle when compared with the healthy status.Misalignment ( or Preload in the instance of unstable bearings )1X,2X,3X,4X etc are shown in frequence spectrum, Phase angle remains changelessThe orbit secret plan will non change with velocity and polar secret plan remains the same.Crack1X, 2X, 3X, 4X etc are shown in frequence spectrum and these continually alteration in amplitude. The stage angle alterations every bit good.There is amplitude and phase alteration of 1X constituent in the polar secret plan,The orbit secret plan alterations from a figure eight form to a loop-the-loop incorporating a little cringle.BendMerely 1X is seen in frequence spectrum, 1X additions with clip and the Phase angle alterationsA signal alteration of stage takes topographic point at critical vel ocity.Mechanical DiarrheaPresence of 0.3X, 0.5X, 1X,1.5X,2x, 2.5X in frequence spectrumMotor Bearing rail atBearing Characteristic Frequencies would be seen in spectrumFluid induced instabilityThe presence of 0.45-0.48 X in spectrum when fluid natural frequence is approached by circumferential velocity of fluid, stand foring petroleum Whirl.The presence of 0.45-0.48 X in spectrum when fluid natural frequence is approached by circumferential velocity of fluid, stand foring Oil WhirlOil Whip consequences when Pump System rotor natural frequence peers fluid s.Fig. 17. Diagnosis Chart for common mistakes ( Beginning Sinha J.K. , M14 Lecture notes 2010, MSc Maintenance Engineering and Asset Management, University of Manchester )Fault Diagnosis ProcessThe overall quiver degrees measuring would be the first phase of protection for the pumps. The ISO recommends the usage of RMS values of speed for overall quiver measuring. Limits for acceptable quiver would be set and configured into the B ently Nevada 1900/65 proctors in footings of Velocity ( RMS ) . These proctors can denote when the bounds have been breached and this would motivate farther probe and trials. These bounds can be obtained from ISO tabular arraies or decided upon in-house by the care applied scientist. The proctor would demo which peculiar detector or detectors has detected a mistake.Furthermore, the proctor and diagnosing package proposed are capable of informations acquisition and storage which make it possible for swerving. The tendencies would be observed hebdomadal and when a set quiver bound is approached, the frequence of review is increased and trials such as the 1s mentioned onwards can be carried out to determine the mistake type, so a fitting care response can be planned.Fig. 18. Swerving illustration ( beginning M04 CBM Lecture notes ( 2010 ) , MSc Maintenance Engineering and Asset Management, University of Manchester )The mistake diagnosing chart would be used in concurrence with the FME A diagram, 1900/65 proctor event logs and assorted applicable show secret plans ( frequence spectrum shows, Bode secret plan, Polar secret plan etc ) to corroborate the exact mistake of the pumps. Pump related frequences would be noted such that when they appear in the frequence spectrum, they can easy be identified.FMEA, Symptoms of identified impairment mechanismsPotential Failure ModePotential Effectss of FailurePotential Failure CausesSymptoms of identified impairment mechanisms1Antifriction Bearing mistake ( Electric motor )Bearing Seizure, Misalignment,Damage to motor shaft, Mechanical seal failure. woeful lubrication, ResonanceHigh Frequency Hump seen in Frequency spectrum related to bearing lodging natural frequence2Shaft CracksShaft Fracture, Loss of pump actionResonance, Manufacturing defects1X, 2X, 3X, 4X etc are shown in frequence spectrum. These addition in amplitude over clip.3CavitationImpeller Damage, Reduced end product, Pump loss.Process disturbances, Gas lock in P ump Barrel thundering operation, High frequence extremums in spectrum4ImbalanceExcessive Vibration, BDamage to bearings and Impellers, Pump loss.Wear, Impeller harm1x constituent in frequence spectrum which increases in amplitude over clip.5Journal Bearing Wear squint shaft drama, Shaft harmMatching misalignmentNoisy operation, Lateral shaft drama,6Impeller DamageReduced end product, Pump loss, Imbalance,Improper assembly,Cavitation, Flow-induced quiverBlade Passing frequence nowadays in frequence spectrum ( 5X,10X etc )7Bent ShaftBearing harm, High quiverMatching misalignment, ResonanceAxial quiver, 1X presence in frequence spectrum8Matching MisalignmentResonance, Damage to pump internals, Mechanical seal failure, Loss of pump.Improper assembly, Resonance1X,2X,3X,4X etc are shown in frequence spectrum9Shaft hang-upDamage to pump internals, Mechanical seal failure, Loss of pump.Matching misalignment0.3X, 0.5X presence in quiver spectrum secret plan10DiarrheaDamage to pump internals, Mechanical seal failure, Loss of pump.Resonance, Improper AssemblyThe presence of 0.5X, 1X, 1.5X, 2X, 2.5X etc in frequence spectrumFig. 19. FMEA tabular array for pump and motor assembly.Cost and Man-Power Implications of Vibration Monitoring and Analysis Set-upThe monetary values given are estimations based on monetary values obtained from assorted cyberspace shopping web sites. They are non unequivocal as Bently Nevada gives monetary values based on different functionality demands and applications worldwide.ItemMeasure required for all three pumpsUnit wrong ( $ )Price ( $ )Accelerometer, Bently Nevada 330400125006000Monitor, Bently Nevada 1900/65325007500Submersible Proximity investigations, Bently Nevada12100012000Tacho Sensor, Bently Nevada3300900Laptop110001000System 1 Diagnostic Software Licence, Bently Nevada12000020000 teach for quiver applied scientist ( from bing care administration )2500Entire Price $ 49,900Fig.20. Cost breakdown of needed equipment for for good mounte d quiver monitoring and analysis system.At lease one applied scientist with accomplishments for quiver monitoring and analysis would be required to supervise the whole set-up. He must be adroit and competent in the usage of assorted show secret plans, signal processing and conditioning, for mistake designation and sensing.This cognition can besides be used on other critical works equipment such as the gas turbines and the centrifugal gas compressor.The dynamic word picture trials are to be contracted out to see service suppliers with the equal ironware and package for real-time life of vibrational gesture. It is estimated that the cost of this service would be circa $ 100,000. This brings the expansive sum of the proposed quiver programme from the frequent pump failures solution to for good installed status monitoring to about $ 150,000.Benefits and Limits of the proposed Vibration-based Condition Monitoring SystemThe proposed set-up for monitoring and analyzing the quiver from th e pumps has rather a figure of benefits.From the concern point of position, it is an investing because it can forestall dearly-won failures. The dollar value of the pumps failure within the biennial period considered in this study easy exceeds $ 1million when fix costs, trim parts, logistics and man-hours expended are considered.For the care administration, the presence of these vibration-based status monitoring equipment, makes it possible for care to be pro-active instead than reactive. Furthermore, frequent failures are eliminated which give room for better planning and more clip for effectual and efficient care.The cost of the quiver monitoring and analysis equipment can be seen to be a little monetary value to pay for plus handiness, enhanced productivity and even safety.The restriction to the proposed system is the accomplishment, cognition and competency of the applied scientist or applied scientists who are in charge of the set-up. The signals for any mistake status would ever be picked up by the monitoring equipment. The proper and accurate diagnosing of mistakes and subsequent care determinations made are the remit of the applied scientist ( s ) responsible for the vibration-based status monitoring programme. In add-on, quiver monitoring equipment could neglect and necessitate replacing.DecisionA glimpse through the summarised failure and care history of the H.P. flair scrubber pumps for a two class period reveals the sum of resources expended on them and their hapless handiness. Clearly so, something new and different from the old attacks should be attempted.This proposed system covers all the grounds- from installing jobs check, procedure vagaries that cause cavitation, to common mistakes experienced by revolving machines such as bearing defects and matching misalignments to advert a few.Besides, the proposed methods are tested and trusted and can put up to nest eggs in care cost, works handiness and safety which are cardinal public presentatio n indexs for most industrial workss. appurtenance i- Bently Nevada 1900/65 Monitor Online Available from www.ge-energy.com/prod_serv/products/oc/en/bently_nevada.htm Accessed 6th May 2010 accessory ii- Bently Nevada 330400 Accelerometers Online Available from www.ge-energy.com/prod_serv/products/oc/en/bently_nevada.htm Accessed 6th May 2010 addition iii- Bently Nevada System 1 Diagnostic Software Online Available from www.ge-energy.com/prod_serv/products/oc/en/bently_nevada.htm Accessed 6th May 2010 addition iv- Vibration Severity Limits for MachinesFig. 21. ISO 10816 Vibration Severity Limit ChartAppendix v- Submersible Proximity Probes Online Available from www.ge-energy.com/prod_serv/products/oc/en/bently_nevada.htm Accessed 6th May 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment